The Construction General Permit requires the operator/permit holder to have SWPPP inspections conducted by qualified personnel. This means that they must be able to identify proper implementation of the erosion and sediment control plan, stormwater management plan and pollution prevention plan. This includes being able to assess the effectiveness of the controls in place on the site.

Qualified Personnel Defined